OUR NEWS

Read all the latest news from Hillcroft Park

Pooley Bridge – Update – 03.09.2020

03Sep

URGENT POOLEY ‘New’ BRIDGE UPDATE:

  • Temporary footbridge at Pooley Bridge closes for good on Mon 7 September
  • It will be removed totally between Mon 7-Sat 12 September
  • Please note – during this time, the temporary car park at Waterfoot will only be open to Ullswater Steamers’ ticket holders to park
  • After the 12 September, one pavement across Pooley New Bridge will open for pedestrian access

SHUTTLE BUSES FOR ULLSWATER STEAMERS PASSENGERS ONLY

  • From Mon 7 – Sat 12 September, Ullswater Steamer ticket holders can access shuttle buses connecting the Steamer Pier to Pooley Bridge and vice versa – they can ONLY use the shuttle on the day of their boat cruise
  • PIER HOUSE SIDE: The bus leaves 15 minutes after the boat lands at the pier. Passengers will have to walk ten minutes from the pier house to the temp car park opposite Waterfoot.
  • POOLEY BRIDGE VILLAGE SIDE: The bus will depart from the village by the church.
  • The dwell time now in the village is approx. 1 hour 30 minutes